tzclark
Member
- Location
- Vancouver Canada
I have a project that required two large jbs with multiple conduits entering on the hazardous area side, nipple through the wall to a non hazardous area jb. I have all conduits sealed entering hazardous area jb, do I need to seal between the two? The two jbs the client is requesting to be back to back. Class 1 zone 2.