(quick scenario) Type 3R pull box installed outdoors/wet location , RMC terminates in the top with a sealing lock ring on one side and a standard locknut on the other.
?-In a general wet location (not 4X ect.) is this permitted by the NEC.
My answer to this would be yes, due to info gathered from the NEC and the Whitebook.
The reason why I ask this is that my gut says to use a threaded connection(myers hub,boss, ect.) on the top of an enclosure in a wet location with RMC. But then again I feel ok with raintight emt fittings.......
Thanks