THE CODE SAYES YOU CAN HAVE A SECOND SERVICE FOR
EMERGENCY INTO A BUILDING. OK, I HAVE A EXISTING BUILDING, WITH A 600AMP SERVICE. I ALSO HAVE A EXISTING 600A GENERATOR. I HAVE BETWEEN 900 AND 1000AMPS, FOR THE NEW SPACE, DEMAND LOADS. THE NEW SPACE WILL BECOME A BANK, WE HAVE COMPUTOR SPACES AND OTHERS LOADS WE WANT ON EMERGENCY. INSTEAD OF UPGRADING THE 600 TO 1000 OR 1200 WE WANT TO BRING IN A SECOND SERVICE. A EMERGENCY LINE. I KNOW THE SECOND SERVICE THE OWNER PAYES FOR IT ALL. THE SECOND SERVICE COMES INTO A TRANSFER SWITCH. THE POWER COMPANY TELLS ME THAT THIS EMERGENCY LINE IS OFF LINE UNTIL THE POWER TO THE BUILDING FAILS. HOW DOES IT KNOW, AND DOES THIS SOUND CORRECT. THANK YOU
EMERGENCY INTO A BUILDING. OK, I HAVE A EXISTING BUILDING, WITH A 600AMP SERVICE. I ALSO HAVE A EXISTING 600A GENERATOR. I HAVE BETWEEN 900 AND 1000AMPS, FOR THE NEW SPACE, DEMAND LOADS. THE NEW SPACE WILL BECOME A BANK, WE HAVE COMPUTOR SPACES AND OTHERS LOADS WE WANT ON EMERGENCY. INSTEAD OF UPGRADING THE 600 TO 1000 OR 1200 WE WANT TO BRING IN A SECOND SERVICE. A EMERGENCY LINE. I KNOW THE SECOND SERVICE THE OWNER PAYES FOR IT ALL. THE SECOND SERVICE COMES INTO A TRANSFER SWITCH. THE POWER COMPANY TELLS ME THAT THIS EMERGENCY LINE IS OFF LINE UNTIL THE POWER TO THE BUILDING FAILS. HOW DOES IT KNOW, AND DOES THIS SOUND CORRECT. THANK YOU