I am looking at a job to repair fire damage to a detached 3 unit building that had a 3 wire sub panel .This building is a motel with several seperate or detached 3 unit buildings.When I rewire 1 building do I need to refeed sub panel with 4 wire to seperate grounds & netraul.I am thinking because it is detached building I can drive grounds & bond all grounded conductors together.