If series rated main service feeds same manufactor distibution panel (series rated)and 2 new panels are added to downstream of distibution of a different manufactor can AIC be choked down by current fuses on the 2 subfeeds 100 amp panels 120/208v 4 W 10K cb's transformer AIC at the load side 42K.
Referencing NEC 110.9. All is in new Building and new serive panels. Different contractors. It is represented the only way to make this code compliant is to replace the 2 news with the same manufactored panels service and dist. panel
Bob Tucknott
Referencing NEC 110.9. All is in new Building and new serive panels. Different contractors. It is represented the only way to make this code compliant is to replace the 2 news with the same manufactored panels service and dist. panel
Bob Tucknott