Hello......
Confirming the requirements for a 100 amp single phase 3 wire dwelling service.
as per 250.50 through 250.104
This home has a well.
Should all I be required to do is run a #6 cu to two ground rods and bond metal water piping with #6.
If so, to confirm even if it was a 200 amp service that would still be the same requirement?
Thank you