This is the info the customer gave initially:
I'd like a quote to provide electrical load calculations, identify panels sizes, and anything else that you would need to properly bid the job.
The power company has been contacted and there will be no gas appliances. They have indicated that it will be 3 phase-11/08. We have to install an 8x8 vault on the exterior.
The meter room is to be in the basement where each of the apartments will be metered individually. It probably makes sense to put a panel inside of each unit.
here are the loads of the appliances
heat pump- 460 V- 3 phase
hot water heater- can do either 208, 240, or 480
range-12,000 watts
microwave- 1000 watts
refridge- 120 V
washer/Dryer combo 120 V, 60 Hz
garbage disposal- 120V, 6.7 amps