NolaTigaBait

Senior Member
Location
New Orleans,LA
3/4" rigid/imc I will look up the mfg tomorrow for you. It is and has always been the standard method here.



ARLINGC00003_M5_TR_001.jpg

so thats what that looks like...i just use a 2'' male pvc
 

Karl H

Senior Member
Location
San Diego,CA
3/4" rigid/imc I will look up the mfg tomorrow for you. It is and has always been the standard method here.



ARLINGC00003_M5_TR_001.jpg

Plastic bushings for the branch circuits entering the service, is pretty common
in the South.

I must say, I do like the riser support, I've never seen that before.
Good job.
 

220/221

Senior Member
Location
AZ
wouldnt fly here. meter too high, 1 support on riser, the junction box. is that an ITE panel that is interesting. we use C/H, so i dont see them much.

Too high? It's about 5'6". You got little people there???

The riser is inspected by POCO. All they care about is the distance above the brace. 30" max on 2", 54" on 2.5".

The brace crossing the JB was my foolish mistake but I didn't think it was a real issue. It's not the first mistake I've made ;) Hell, it's not the first one I made that day.

We used to use the Cutler Hammer BR series but the Seimans has copper bus.
 