Here is a service for a residential apartment building, with four 800 Amp disconnects feeding different meter centers, and a house meter CT cabinet feeding two 400 Amp disconnects.
Everything ahead of the service disconnects is considered service conductors, and does not apply to the tap rules in the NEC. Does anyone see a code violation in this service configuration containing two wiring troughs?