a 400 amp single phase service has a meter and 12inches away a 400 amp enclosure.conductors are 2 runs of 3/0 copper wire so 6 wires. raceway is 1- 2 and a half inch liquidtight flex in between the two so a 2 1/2 sealtight can have 7 3/0 for fill but since this is a service can it be all in one conduit or does it need to be two? is there a reference im not finding in nec that says i cant