I have a question about where in the code does it tell you to have a disconnecting means prior to the main panel for long residential service runs?
I have been told that the only time you need a disconnecting means before the panel is if the SE cable is more than 5 feet between the interior panel and the meter not the distance between the taps and the meter.
The question refers to a job that has about 50 feet of SE cable that runs between the taps and the meter.
Thanks Fellas
I have been told that the only time you need a disconnecting means before the panel is if the SE cable is more than 5 feet between the interior panel and the meter not the distance between the taps and the meter.
The question refers to a job that has about 50 feet of SE cable that runs between the taps and the meter.