Hey all, from my utility transformer to gear I have 10-3 1/2" PVC then changing over to grc as it leaves ground level into a mcc 4000a with a duct welded to the steel (grounded) floor of the mcc , I have Meyers hubs on all conduits are bonding bushings required?
Thanks