I have a situation where the power companies transformer is about 300 ft from the panel we are feeding. Due to wall space problems the meter is being placed by the trans along with a 200 amp main breaker . The panel at the building now becomes a sub panel. So my question is , do i have to install 2 ground rods at the main panel and no gec at the sub panel. There is no water in the new building,but there is a concrete enclosed electrode allready installed?