Suppose we have a typical underground house service feed from a pad mount transformer with the meter on the outside of the house and the service panel inside opposite the meter. We would all agree that the service lateral runs from the transformer to the meter and the service entrance conductors from the meter to the service panel.
No suppose that we move the meter next to the transformer so that it is no longer on the house. Does the service lateral go from the transformer to the meter, this being the first point of connection, and the the conductors from the meter to the house become service entrance conductors, or does the service lateral remain from the transformer to the house and the point of connection between each at the entrance to the house?
No suppose that we move the meter next to the transformer so that it is no longer on the house. Does the service lateral go from the transformer to the meter, this being the first point of connection, and the the conductors from the meter to the house become service entrance conductors, or does the service lateral remain from the transformer to the house and the point of connection between each at the entrance to the house?