I have a job which requires installation of a 60 amp 120/208 1ph service panel in an unattached pole building at a local school. The architect's drawing shows feeding this panel from a 3ph 4-wire sub panel in the main building. Is this OK,ie; feeding a sub from a sub? If so how do I properly address the issue of bonding and grounding? Thanks in advance for your help.