I need to run a 4" IMC to a sub panel in a commercial building. The roof deck is about 40' high, but the drop tile ceiling is only 10'. My question is, would it pass code if I were to run the conduit across the tops of the interior walls vs. having to take it all the way to the roof to strap off to the trusses.
Thanks!