For new industrial facility, 1200 A 480/277 service - standby generator with ATS and all loads able to be powered from genset -
Is service rated transfer switch with integral mains the most efficient design that most people are specifying? Is there any benefit to a separate service disconnect from a maintenance or arc-flash perspective?
Is service rated transfer switch with integral mains the most efficient design that most people are specifying? Is there any benefit to a separate service disconnect from a maintenance or arc-flash perspective?