I'm in the process of starting a new job that part of it is installing a new 2000 amp service and . The service will supply all the hvac loads that are being taken out and upgraded including 2 new chillers. The drawings call for 6 sets of 4 - 750 mcm to feed this new 2000 amp service. This seems like a large over kill . By looking at it it looks like I should be able to use 6 sets of 4-500 mcm to feed this. Am I correct in this assumption? I'm trying to get away from using the 750mcm if I can. It is to much of a pain to use 750 and also a greater cost to the customer if they don't need it.