came to a job there is a disconnect about 40' from the pole the power co. requested the at that location for easy location to read it. then the trench goes down a hill ant turns to the trailer approx 200' at that point goers into a 12" by 12" pvc box and splits to two disconnects ground rode is brought in to the 12*12.
my question is by putting the disconnect at the meeter isn't every thing down line 4 wire and sub panel . with possible exception that the power co. requested the disconnect for service to the meeter ?
my question is by putting the disconnect at the meeter isn't every thing down line 4 wire and sub panel . with possible exception that the power co. requested the disconnect for service to the meeter ?