Picture a small town, downtown Main Street. The old Coast To Coast hardware store. Concrete/brick building, basement, main level, and upstairs. A fairly run down building. Concrete in alley, buildings butt up each side.
Planning to install service on back of building in alley. Have a long run through bsmt to hit waterline with #4. Have no clue how to deal with ground rods! Everything is concrete!
Anybody have any ideas before I cry to the inspector?!
Thanks!
Planning to install service on back of building in alley. Have a long run through bsmt to hit waterline with #4. Have no clue how to deal with ground rods! Everything is concrete!
Anybody have any ideas before I cry to the inspector?!
Thanks!