mickeyrench
Senior Member
- Location
- edison, n.j.
doing a 200 amp service 120/240 3 wire with the panels being 10 ' into the building. i need 2 100amp cb outside to protect the cable before going into house. i don't know how to wire my mwp and ground rod connections to cb boxes before the panels. do i install 4 wires from cb to panels. thanks for the respones