Setting up power for 208 Welder

Status
Not open for further replies.

SPK

New member
Location
Arizona
Hi,
I want to install two 50 A receptacles for two welders I have off two 2 pole 30 A breaker's in my shop.
Can I run the two receptacles and a ground through a 3/4" EMT, the run is approximately 140 ft so 5 #8 (4 hot's 1 ground) or do I need to keep them separate. There is an empty 1 1/4" Conduit from the panel I was going to use to get me 50 ft from where I am putting the two receptacles.

Thank you all for your help!
 
I am closing this thread, in accordance with the Forum Rules.

This site is designed for:

  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals


* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain.

A reminder to all members, if you see a questionable post, feel free to report it by clicking the
report-40b.png
button at the bottom left corner of the post.
 
Status
Not open for further replies.
Top