NEC 2008: 400A 240V single phase service (Farm) - Utillity wants a owner disconnect so that they can stop running out to pull the meter base. Owner said OK. We go from meter base to 2P disconnect to power distribution block to multiple (4 to 6 eventually) panels with CB disconnects (125 to 200A). Owner purchased a non-fused disconnect. Does the disconnect have to be fused. Local inspector thinks so but she can't find it find it in the code.