Shunt breaker as main disconnect

Status
Not open for further replies.
Art 230.70(A)(1) states or inside nearest the pointor the service conductors, the meter Paks are 2 inches off the complex structure in the alley way. All good to go. See you all with any future questions. Thanks and best.
So if these disconnects satisfy 230.70(A)(1) being that they're 2" from the other structures then why do you need the shunt trip?
 
Status
Not open for further replies.
Top