Strange question got asked of me today. I am bidding on a hanger that is being built on the back of a existing hanger. The back wall will be common to both buildings. Another electrical contractor told the owner a 3 phase builing could not connect or touch a single phase building. Is this correct can you give me a code refrence if it is?