I have seven spaces to be separately metered. One of the spaces will be 208/120 3ph and the rest will be part of two 3-position meter sockets, 3ph in/2 ph out.
Would putting the 6 meters after a 600A safety switch and the one 3ph meter on a meter/main socket qualify as having two switches to disconnect the service? Maybe if they were properly labeled?
Something like this:

And does that 600A disconnect have to be fused if there is a main breaker on each position of the meter socket?