mattsilkwood
Senior Member
- Location
- missouri
i should have been more clear my friend didnt do this hes the concrete guy. and the TOP of the stubs are 2" below finished floor, thatll be a pain to get a tape though:grin: . i guess they told the guy what he had wouldnt work but he got all cocky and said he knew what he was doing and concrete guys shouldnt tell him how to run pipe.so they brought in the bobcat put in thier fill and compacted it. i guess he will find out monday what they were talking about. they tell me pvc dosent hold up yo good when you drive a bobcat on itJim W in Tampa said:I would not mention i even know him.It should not pass slab inspection.It will crack if only 2 inches
