I did a rough inspection today on a new house and found the electrical contractor had run #2AL SER under the crawl space and exited the house in the rear. The cable then went into a 2" PVC conduit sleeve for about 10ft. and up through a concrete slab for a new garage. This is going to be used for a sub panel for the garage and a new pool. Just didn't look right to me.
I went to article 338, 2005 NEC...with the exception of the 680.25 problem using this apparently NEW sub panel to power up the pool, I couldn't find a a reason why this would not be allowed...any thoughts...thanks