If all your work is in California then you have until Jan 1st 2020. But yes, then it will change. This is why SMA partnered with Tigo, I think.
Regarding TIGO and SMA. Interesting.
Never used it!
Is this a future or existing deal?
Has anyone installed such a system?
Does TIGO obviate the need for the SMA RSS?
Can you still use the SPS feature of the SMA inverter?
Seems like it would be more expensive than Solaredge or Enphase. Significantly?
Optimizers? I'm pretty sure that the basic Tigo is just a module add-on switch that opens when it doesn't see the dead man signal on the DC conductors. SMA is going to build the signal transmitters into the inverters, so that's all you need for now. Pretty soon many (most? all?) module manufacturers will put the switches in the junction boxes so then it will be back to business as usual.I believe so. It may depend on exactly which type of optimizers you install.
Optimizers? I'm pretty sure that the basic Tigo is just a module add-on switch that opens when it doesn't see the dead man signal on the DC conductors. SMA is going to build the signal transmitters into the inverters, so that's all you need for now. Pretty soon many (most? all?) module manufacturers will put the switches in the junction boxes so then it will be back to business as usual.
I'm splitting a job with my solar counterpart , which we hope to have passed pre 1-1-19
The RSD specifics juxtaposed to PV make/model confuse me in 690.....
I had thought....possibly in error, that the whole RSD was for FF's venting roofs ?? So i'm confused as to how this impending change compliments that....:?~RJ~