mstrlucky74
Senior Member
- Location
- NJ
Curious time you guys think it would take to complete this splice. 4 # 350' THHN to be spliced on each side of tap block. Wires already cut and ready in box. You must, strip and terminate. I think tagging and taping might be required.
In your opinion how long would it take to do this? I'm thinking about 20 min per conductor x's 8.
Thanks
https://commerce.ilsco.com/e2wShopp...2&parentLink=2100001183:3100012208:3100012512
In your opinion how long would it take to do this? I'm thinking about 20 min per conductor x's 8.
Thanks
https://commerce.ilsco.com/e2wShopp...2&parentLink=2100001183:3100012208:3100012512
