Hi Folks,
This is my first post in this community.
I would like some help regarding split factor calculation for a GIS substation my company is building. As i havent done this earlier I require some help in this region. This substation has overheadlines coming in and all underground cables leaving the substation. I've looked into IEEE papers and only information for GIS substations with Underground cabling system is found in IEEE-80-2000. The details are as follows:
1. 132kV System level
2.40kA fault current for 1sec.
3.two circuits of OHL feeding the substation
4. all outgoing 132kV are underground cables.
5.system frequency 50Hz
6. lower level underground cables outgoing at 11kV
Pls assist me as soon as possible.
Asad
This is my first post in this community.
I would like some help regarding split factor calculation for a GIS substation my company is building. As i havent done this earlier I require some help in this region. This substation has overheadlines coming in and all underground cables leaving the substation. I've looked into IEEE papers and only information for GIS substations with Underground cabling system is found in IEEE-80-2000. The details are as follows:
1. 132kV System level
2.40kA fault current for 1sec.
3.two circuits of OHL feeding the substation
4. all outgoing 132kV are underground cables.
5.system frequency 50Hz
6. lower level underground cables outgoing at 11kV
Pls assist me as soon as possible.
Asad