BamBam9109
New User
- Location
- Texas
- Occupation
- Un-Informed Foreman
I am running a corrections job, where basically the previous company came in and did a bad job. We have to install 1M+ plastic bushings in panels and I am wondering if it a code violation to split them rather than pulling all of those wires off each breaker.