I have a situation where we have a 480/208V step-down transformer within a tenant space that has no available building steel or metal pipe for grounding/bonding. The main service ground bus is 300ft. away. We are considering driving a ground rod for connection to ground however, there are several of these spaces that will require the same grounding scenario in this building. Code allows the use of a ground rod when there is no building steel or metal water pipe available. The question is, would it be better to ground multiple transformers to one ground rod or drive individual ground rods for each transformer?