OceanTrek

New member
Location
Florida
I am managing a new marina. It will be 12 months before the power to one of our docks can be run. I want to run a temp 3 wire line out 1000' from a sub station. At the end of the run I want 2 x 50 amp plugs for transient boats coming through. Any suggestions of cable size and what transformer to use.
 
You will need to contact a local licensed Electrical Contractor for this.

I am closing this thread in accordance with forum rules