Just a quick question regarding the overall setup for an ATS,
If you have a main service panel and want to choose the loads that a generator will serve (to size the generator and ATS), my thinking tells me you would move those selected loads to a sub-panel. Then the feeder for the sub-panel would run through the ATS and then onto the sub-panel.
When grid power is out the ATS senses it and kicks on the generator and switches for that sub-panel to be fed by the generator?
What are the pros and cons of generac's integrated ATS/Sub-panel setup vs using separate components?
Thanks!
If you have a main service panel and want to choose the loads that a generator will serve (to size the generator and ATS), my thinking tells me you would move those selected loads to a sub-panel. Then the feeder for the sub-panel would run through the ATS and then onto the sub-panel.
When grid power is out the ATS senses it and kicks on the generator and switches for that sub-panel to be fed by the generator?
What are the pros and cons of generac's integrated ATS/Sub-panel setup vs using separate components?
Thanks!