Solar Noob
Member
- Location
- California
- Occupation
- Electrical Engineering (in training)
I am confused as I can't find too much information on this interconnection method one of my coworkers suggested I use for a job. There are two sub panels attached to the main panel by breaker, and so his strategy to interconnect would be to refeed the MSP (200A main, 200A buss) into a new 200A main 400A buss subpanel (that is replacing an existing sub) and feed the other existing sub through the bigger subpanel. He claims that NEC 705.12 permits this method of interconnection (as we are landing a 90A breaker in the new sub) as it follows the 120% rule, as the new sub provides us 280A of backfeed from the solar. Is this a correct interpretation or is his thinking flawed?