Nutmegger
Senior Member
- Location
- Fairfield County, Connecticut
I understand load calcs, but what about the situation when the customer just wants to add an "empty" sub because there is no more room in the main panel?
I'd imagine it would be OK to put a 125A main lug panel and feed it from a 60A or 100A breaker in the main, but what are other considerations/limits when there are no loads to be calculated?
I'd imagine it would be OK to put a 125A main lug panel and feed it from a 60A or 100A breaker in the main, but what are other considerations/limits when there are no loads to be calculated?