jwatts
Member
- Location
- Chicago, IL
A proposed single line drawing shows a 200 amp/3phase/208v panel with intergral surge suppression feeding a 100 amp/3phase panel. The sub-panel also has a surge suppressor breaker that is currently not wired in. Would there be any issues with this set up. It seems redundant....however i was just curiuous if there was any possible issues with the proposed setup.