Sending a progress report to the shop and figured I would share with the rest of the class.

Here is Al building new 1200A 208y/120 service.

promedservice001.jpg


promedservice002.jpg


Here is my son in the unusually cool weather showing the POCO tranny out of level before we undermine it to install new laterals.

promedservice003.jpg


promedservice004.jpg


Three new 4" and a 2" into POCO tranny.

promedservice005.jpg
 

480sparky

Senior Member
Location
Iowegia
Where's OSHA when you need them? :D

Extension ladder over-extended......... standing between ladder and object......... standing too high on a stepladder...........
 

ohmhead

Senior Member
Location
ORLANDO FLA
Well chris looks good nice work but hey dont even say its cold down there iam in jacksonville now thats cold in florida !:D

I got some pictures for ya new job just started .
 

chris kennedy

Senior Member
Location
Miami Fla.
Occupation
60 yr old tool twisting electrician
Well chris looks good nice work but hey dont even say its cold down there iam in jacksonville now thats cold in florida !:D

I got some pictures for ya new job just started .

Where are the pictures of the 480 temp underground accident?
 

ohmhead

Senior Member
Location
ORLANDO FLA
Where are the pictures of the 480 temp underground accident?

Well we dont take pictures of stuff like that i actually had to work that day at getting power back on since its feeding the concrete pumps and vibrators on the decks soooo no time for photos ! Just elbows and ########

But i got some underground stuff for ya ill put it on new post for ya Chris . Well maybe just one ready
 

ohmhead

Senior Member
Location
ORLANDO FLA
Well Chris heres

100_0443.jpg



My guys turning on power after the mechanical contractor hit the 400 amp feeder as they were digging in front of the temp power board installing there chiller lines on the west side we have one on the east side also i cant wait for that to blow next .

They hit a few pipes we had to get the 400 amp on first!

We have two temp 1600amp services east and west .

This is due to a relocation of chiller lines and we had to turn on power fast concrete doesnt wait in the pump too long !
 
Last edited:

Riograndeelectric

Senior Member
Green to X0
White to X3

I'm confused. What's up with that?

Edit: maybe that's blue, not white, but then I'd ask where the neutral is? I really should be asking why are you pulling a ground?

looks to me like the XO conductors have been reduced in size?
doe s not seem correct. X3 conductors being used as Grounding conductors instead of Grounded conductors.
are these installed per the Engineer 1 line?
 

iwire

Moderator
Staff member
Location
Massachusetts
That are set up properly.



Next time, I'll use a nice conductive steel scaffold if it gives you a warm and fuzzy feeling.

Exactly, when you decide it is OK it is fine, when someone else makes the same types of decisions you find fault with it.

Kind of hypocritical IMPO.
 

480sparky

Senior Member
Location
Iowegia
Exactly, when you decide it is OK it is fine, when someone else makes the same types of decisions you find fault with it.

Kind of hypocritical IMPO.


Next time I work on a ceiling fan that's 26' off the floor and it's energized, I'll call you and get an OSHA-approved method.
 