Supply side

pedro1200

Senior Member
Location
Ny
Occupation
Electrician
SSBJ are sized per t.250.102c because its on the supply side with no overcurrent protection. Is it safe to say that all other bonding jumpers are on the load side even though they also sized to t.250.102c
 
Is it safe to say that all other bonding jumpers are on the load side even though they also sized to t.250.102c
What are the other bonding jumpers from that table? Are they typically before or after an OCPD?
 
Yes they are I was asking because I wanted to know why are they all on the same table
 
Top