I have a controls contractor that is installing (6) strand fiber in an existing utility tunnel on existing j-hooks that are 6'-0" on center. I could not find anything in Article 770 that stated the support requirements for this cable. Can someone point me in the right sirection?
Thanks,
Ed
Thanks,
Ed