mstrlucky74
Senior Member
- Location
- NJ
Curious, as I have not come across this note before( All fixtures must be suspended/supported from all 4 corners from structure above). Forlay-in 2x2 or 2x4 I was under the impression the guys( in NYC) were just layingthese in and using clips and not attaching to structure above. Don’t think this is seismic related although I’mnot sure. Has anyone done this in NYC. Are you just using aircraft cable? Thanks.