These are surface mounted to concrete slab feed with EMT. Regarding boxes and feeding you could do the following ways( not including EM's). Can't use FMC to tail to fixtures.
1. 4" box next to each fixtures
2. 4" box between a few fixtures and branch off
3. Could you go directly in/out of the fixtures with the EMT with no boxes? THat would require splicing in the fixtures which may not be allowed???
1. 4" box next to each fixtures
2. 4" box between a few fixtures and branch off
3. Could you go directly in/out of the fixtures with the EMT with no boxes? THat would require splicing in the fixtures which may not be allowed???