dcl34769
Senior Member
- Location
- saint cloud,fl
We are installing a MeterMod that has a main disconnect section. Plans call for a surge arrester to be installed in the main section. Article 280 doesn't seem to specify weather or not the arrester requires an OPD. Are the lead wires coming from the arrester allowed to be directly connected to the buss work?