I will try this post again , lost my work here. After a arc flash survey a company recommends changing the trips on the switchgear to lower the hazard to a level 2 from a 4. Can operating these cb's remotely be another way to do that safetly ? Also they determined that the mcc's were at a level 4 at the line side of of each main cb but I did not see any mention of the load side buckets. Should they have their own rating or is the highest level used on the labels?
Don't know much about how this works , if anyone has any input on this type of work we would really like to here it.
Thanks for your input in advance.
Don't know much about how this works , if anyone has any input on this type of work we would really like to here it.
Thanks for your input in advance.