mstrlucky74
Senior Member
- Location
- NJ
I know there are variable here but assuming sections are in room about how long and how many guys do you think it would take to put together a 4000a 3 section piece of switchgear...bus tied together and bolted. Only way I know of switchgear section joining together...bus tied. I assumed it also has to be anchored to floor and sometimes I believe there is even strut embedded in the floor in which it mounts to. I'm really curious about the work to put the section together. Thanks