210.52
In deweling units if I switch a receptacle it does not count towards meeting 210.52 (2)....correct?
If I just switch the top half and split the receptacle does the bottom half count toward my 210.52 requirement....or if I made the receptacle a double duplex and only switch the top half of one of the duplex receptacles. Will that satisfy it?
In deweling units if I switch a receptacle it does not count towards meeting 210.52 (2)....correct?