Switching conduit from buried to exterior run

Status
Not open for further replies.

JayEstes

New member
I have some galvanized RMC coming up out of the ground and into a metal j-box. From the j-box, I have another exterior run of some distance before entering the main panel. Must I maintain RMC between the metal j-box (above ground) and the main panel, or can I switch to PVC conduit? I can't figure out how to look this up in the code, and have searched this forum, but can't find anything that discusses it. Thanks for your input.

Jay
 
I am closing this thread, in accordance with the Forum Rules.

This site is designed for:

  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals


* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain.

A reminder to all members, if you see a questionable post, feel free to report it by clicking the
report-40b.png
button at the bottom left corner of the post.
 
Status
Not open for further replies.
Top