codequestion
Banned
- Location
- MD, USA
Attached is system grounding detail new service disconnect switch as shown for cell tower on building.  See existing system grounding detail, single line diagram and elevation below. I am tying service disconnect switch to existing building system ground electrode.  See both diagrams. Is it per NEC 2014 Article 250? Anything not per NEC 2014 Article 250?
	
		
			
		
		
	
				
			 
				
 
			 
			 
 
		 
 
		