So a customer had (2) 100 amp disconnects placed on the outside of his house off the meter. He has 200 amp service to the house. 1 disconnect goes to the existing 100 amp panel (done when the house was built circa 1980) He now wants another 100 amp panel installed off of the other 100 amp disconnect. What would be the proper way to ground both panels? Run 2 grounding electrode conductors to the grounding electrode, 1 from each disconnect? What about the ground to the homes water service? Thanks for all your help!